Engineer of Record
DOB electrical plan review filings for contractors and equipment suppliers. One master agreement, a task order per job, a fixed fee per filing.
How it worksSealed DOB electrical plan review filings, capacity studies and power system studies, for the contractors and suppliers who build the work and the owners who pay for it.
New firm. 25 years in critical power.
NY PE No. 092566 · NYSED COA No. 0024417 · No equipment sales, no commissions
Answer a few questions. The logic follows NYC Electrical Code §110.2(B) and 1 RCNY §4000-01. It's a guide, not a code determination. Nothing you enter leaves this page.
DOB electrical plan review filings for contractors and equipment suppliers. One master agreement, a task order per job, a fixed fee per filing.
How it worksHeat pumps, EV charging, electric water heating. Load studies, Con Edison load letters and service upgrade design.
Capacity studiesShort-circuit, protective device coordination and arc flash (IEEE 1584-2018 / NFPA 70E). Selective coordination reports for DOB.
StudiesAnnual report certification by a PE. Help for late filers. An electrical readiness plan for the 2030 limits.
LL9725 years across the critical power chain: switchgear, generators, automatic and static transfer switches, UPS, and power control systems.
No equipment sales. No commissions. The design answers to the code and to you, not to a product line.
One master agreement. A task order per job. Standard turnaround: 11 business days from a complete package, 5 for a resubmittal.
A sample filing package on a fictional building: the one-line, the kVA calculation, a coordination excerpt and a capacity summary.
View the samplePrincipal, Strafer Engineering PLLC
25 years across the critical power chain: switchgear, generators, automatic and static transfer switches, UPS, and power control systems.
Send the one-line and the equipment list. We'll tell you what the filing needs and quote a fixed fee.
jstrafer@straferengineering.com
Site visits in all five boroughs and across New York State.