Engineer of record for NYC electrical plan review.
For electrical contractors and generator, switchgear and UPS suppliers. We prepare, seal and submit the filing for work designed under our responsible charge. One master agreement covers every job.
When does a job need plan review?
Under the 2025 NYC Electrical Code §110.2(B), DOB approval is required before you build service equipment, transformers, UPS systems, generators, paralleling gear, energy storage, PV, fuel cells, microgrids, cogeneration or stationary batteries when:
- New equipment totals 1000 kVA or more.
- You change a 1000 kVA-or-larger installation, up to and including 2nd-level overcurrent protection.
- An addition brings the total to 1000 kVA or more.
- Added equipment affects clearances in a 1000 kVA-or-larger room.
- Any part is above 1000 V AC or 1500 V DC, whatever the kVA.
The submission must come from a New York licensed and registered PE or RA.
How DOB counts kVA
Add the maximum ampere ratings of every service disconnect on the common service entrance, new and existing, and convert to kVA at the operating voltage. Count a fire pump disconnect at 125% of the fire pump's full-load amps.
For a transformer, UPS, generator or other source, use its maximum kVA output rating. (§110.2(C))
Exceptions in §110.2(B): fire alarm service taps, and adding one 2nd-level overcurrent device of 200 A or less.
What we prepare
- One-line diagram to the 2nd level of overcurrent protection: ratings, make and type, interrupting ratings, wire sizes, frame and trip.
- Plan view to scale from the point of service entrance.
- Equipment room layout, working clearances and egress.
- Service kVA calculation per §110.2(C).
- Available fault current at the service and wherever interrupting ratings change.
- Generator connection, frame grounding and neutral bonding; room layout for generators of 1000 kVA and up.
- Room cooling note where service equipment totals 2000 kVA or more.
- Selective coordination report, signed by a PE, before inspection.
- EPR intake, cover sheet, objection responses and post-approval amendments.
How it works
-
Sign once
One master services agreement: scope definitions, responsible charge, a fixed-fee schedule shared privately, and payment terms.
-
Issue a task order
Send the job: address, equipment list, one-line sketch or submittals. We confirm what DOB will need and the fixed fee.
-
We design and seal
Site visit where needed, in all five boroughs. We prepare the package under our responsible charge and submit it.
-
We carry it through
We answer DOB objections and file amendments through approval, then deliver the selective coordination report before inspection.
Standard turnaround
"Complete" means the intake items below are in hand. DOB's own review time is separate and set by DOB. Expedited schedules can be quoted per task order.
11business days from a complete submittal package
5business days for a complete resubmittal
What we need from you
- Site address and building use
- Utility (Con Edison or other) and service size, existing and proposed
- Equipment list with ratings, and submittals or cut sheets
- Existing one-line or panel schedules, if any
- Room dimensions and photos of the electrical room
- Generator, UPS or energy storage data, if in scope
Standalone selective coordination reports
DOB requires a PE selective coordination report before electrical inspection, with time-current curves, short-circuit calculations and a summary of findings. That PE can be different from the applicant. We prepare it as its own task order.
Ask about a coordination reportWhat we seal, and what we don't.
We seal only drawings and reports prepared by us or under our direct supervision. We don't review and stamp someone else's set. If you already have drawings, we use them as input and issue our own.
Generator, switchgear and UPS suppliers
Offer your customers a filing path without carrying a PE on staff. We sell no equipment and take no commissions, so there's no competing product in the room. Engineering is billed under our agreement with your customer or with you.
Talk about a supplier agreementQuestions contractors ask
Can a master electrician file plan review?
No. DOB requires Electrical Plan Review submissions to come from a New York State licensed and registered Professional Engineer or Registered Architect.
What does DOB charge?
DOB lists a $650 fee for an initial EPR filing and $130 for a post-approval amendment. Our engineering fee is separate: a fixed fee per filing, quoted per task order.
Which code applies?
EPR filings submitted to DOB since December 21, 2025 are reviewed under the 2025 NYC Electrical Code. Work approved under the 2011 code before that date stays on the 2011 code for inspection.
How do filings reach DOB now?
Since September 1, 2026, initial filings and post-approval amendments go through DOB’s EPR Intake Form. DOB replies with a job number, the fee and submission instructions.
Will you stamp drawings someone else prepared?
No. We seal only work prepared by us or under our direct supervision. If you have drawings, we use them as input and issue our own.
Do you work outside New York City?
Yes, anywhere in New York State. We practice in New York only.
Can you help after an outage or equipment failure?
Yes, with scheduled or expedited post-event diagnostic and forensic engineering.
Have a job going to DOB?
Send the one-line and the equipment list. We'll tell you what the filing needs and quote a fixed fee.