Capacity study
Existing demand, added loads, headroom and options, in a short report an owner or board can act on.
Heat pumps, EV chargers and electric water heating all land on the same service. We find out how much room you have, what has to change, and what the utility needs to see.
Most electrification plans start with the mechanical design. The constraint is usually electrical: the service size, the switchboard, the riser and the utility's ability to serve more load.
Answer the capacity question first and the rest of the project gets cheaper to plan. Skip it and the heat pump order can arrive before the building can power it.
Existing demand, added loads, headroom and options, in a short report an owner or board can act on.
The load information and one-line Con Edison or your utility asks for when you request new or added service.
Sealed drawings for the new or upgraded service, switchboard and distribution, including the DOB plan review filing when required.
We work with Con Edison and any New York utility, including O&R, PSEG Long Island, National Grid, NYSEG, RG&E and Central Hudson. We are independent of all of them.
The sample deliverable includes a capacity summary for a fictional building: existing demand, added loads, headroom and an upgrade path.
View the sample capacity summarySend the address, the latest 12 months of utility bills and the planned equipment. We'll tell you what the study needs and quote a fixed fee.
jstrafer@straferengineering.com
Site visits in all five boroughs and across New York State.