Electrification & Capacity

Will your service carry the new load?

Heat pumps, EV chargers and electric water heating all land on the same service. We find out how much room you have, what has to change, and what the utility needs to see.

The question

Capacity first. Equipment second.

Most electrification plans start with the mechanical design. The constraint is usually electrical: the service size, the switchboard, the riser and the utility's ability to serve more load.

Answer the capacity question first and the rest of the project gets cheaper to plan. Skip it and the heat pump order can arrive before the building can power it.

What a capacity study answers

  • How much load the existing service, switchboard and feeders carry today, from utility demand data or metering.
  • What the new heat pump, EV and water heating loads add, at their real operating conditions.
  • Whether the existing service has room, and where it runs out first.
  • Upgrade options: load management, a larger service, a second service, or phasing.
  • Whether an upgrade reaches 1000 kVA and triggers DOB Electrical Plan Review.
Services

From study to filing

Capacity study

Existing demand, added loads, headroom and options, in a short report an owner or board can act on.

Utility load letters

The load information and one-line Con Edison or your utility asks for when you request new or added service.

Service upgrade design

Sealed drawings for the new or upgraded service, switchboard and distribution, including the DOB plan review filing when required.

We work with Con Edison and any New York utility, including O&R, PSEG Long Island, National Grid, NYSEG, RG&E and Central Hudson. We are independent of all of them.

Who it's for

Owners, boards and the contractors they hire

  • Co-op and condo boards weighing heat pump retrofits
  • Property managers planning EV charging in garages
  • Owners preparing for LL97's 2030 limits
  • Mechanical and electrical contractors who need the capacity answer before they bid

See the format

The sample deliverable includes a capacity summary for a fictional building: existing demand, added loads, headroom and an upgrade path.

View the sample capacity summary

Guide: heat pumps and building electrical capacity in NYC →

Planning heat pumps or EV charging?

Send the address, the latest 12 months of utility bills and the planned equipment. We'll tell you what the study needs and quote a fixed fee.

jstrafer@straferengineering.com
Site visits in all five boroughs and across New York State.