Why capacity comes first
Heat pumps, EV chargers and heat pump water heaters move energy use from fuel to electricity. All of it lands on the building's electrical service. In older buildings the service, the switchboard and the risers were sized for lighting, elevators and plug loads, not for heating.
LL97's stricter limits start in 2030. Many owners will electrify to meet them, which makes the capacity question urgent.
How to size the question
- Know the service. Service ampere rating and voltage give the capacity. At 208 V, 3-phase: kVA = √3 × 208 × amps ÷ 1000. A 1200 A service is about 432 kVA.
- Know the actual demand. Use twelve months of utility demand data, or metering if the account doesn't record demand. Add a margin.
- Add the new loads realistically. Heat pumps at the design heating condition, including any backup resistance heat. EV chargers at their managed limit if you use load management. Water heating with its backup elements.
- Compare and find the first limit. It may be the service, a feeder, a riser or the utility's ability to serve more load.
Options when it doesn't fit
- Manage and phase. Load management for EV charging, staged electrification, keeping some existing equipment for peak days.
- Upgrade the service. Requires a utility service request with load information and a new or modified service design.
- Add a service. Sometimes needed when the existing one can't grow.
When the upgrade needs DOB plan review
If new service equipment totals 1000 kVA or more, or an addition brings the service to 1000 kVA or more, NYC Electrical Code §110.2(B) requires Electrical Plan Review, filed by a PE or RA. At 208 V, 1000 kVA is roughly 2776 A, so many residential upgrades stay below it. At 480 V it is roughly 1203 A.
What to bring to a first conversation
- The latest twelve months of electric bills, with demand if available
- Service size and voltage (from the switchboard nameplate)
- The planned heat pump, EV and water heating equipment
- Any LL97 targets or reports you already have
See a sample capacity summary, or read about capacity studies.
General information, not advice for a specific project. Codes and DOB procedures change; check the sources below for the current text.