LL97 annual report: what the RDP does

Who may certify a Local Law 97 report, what the registered design professional is attesting to, and how to get the report done on time.

By Justin M. Strafer, PE, MBA · Updated

Who must certify

LL97's Article 320 requires covered buildings to file an annual greenhouse gas emissions report by May 1. DOB states the report must be certified by a registered design professional (RDP): a New York licensed Professional Engineer or Registered Architect. DOB also notes that in limited cases a retro-commissioning agent can do this work.

For Article 321 buildings using the performance-based pathway, only an RDP may submit the professional attestation form.

Who is covered

LL97 covers most buildings over 25,000 gross square feet, two or more buildings on the same tax lot that together exceed 50,000 gross square feet, and certain groups of condominium buildings. DOB publishes a Covered Buildings List (the 2026 list was published in March 2026); owners should check their building's listing and compliance pathway.

What the RDP is attesting to

The RDP signs a professional attestation that the information submitted is accurate. DOB's attestation forms warn that falsifying a material statement is a misdemeanor punishable by a fine, imprisonment or both. An RDP should only certify what they have actually reviewed.

In practice that means reviewing:

  • The building's gross floor area and occupancy groups as DOB and the Department of Finance record them
  • The energy and fuel use data for the calendar year
  • The emissions calculation and the building's limit
  • Any deductions or alternative calculation methods claimed, with their documentation

Deadlines

In 2026, DOB required reports by May 1 and no later than June 30. Owners could apply by June 30 to extend the deadline to August 29, 2026. A professional attestation is not required to apply for an extension. DOB said 2025 extensions did not carry over to 2026, so check each year's service notice.

Working with a benchmarking firm

Many owners use a benchmarking or energy-services firm to prepare the data. The RDP then reviews and certifies it. The handoff works best when the RDP has access to the underlying data, not just the summary, and enough time before the deadline to resolve questions.

LL97 report certification →

General information, not advice for a specific project. Codes and DOB procedures change; check the sources below for the current text.

Have a job going to DOB?

Send the one-line and the equipment list. We'll tell you what the filing needs and quote a fixed fee.

jstrafer@straferengineering.com
Site visits in all five boroughs and across New York State.